Wakefield Beasley & Associates is the architect behind the new Braves year-round mixed-use facility. WBA is responsible for all facets of the architectural design process for the ‘The Battery’ multi-family, retail and Comcast office building. The work of an architect is always in the details and making sure those details are correct.

Recently the WBA Office/Industrial studio went on-site at the park to see how progress was coming along and to see those details in real life. For some, this is their first architecture project being brought to life and for others it is another one for the books. Check out the renderings and photos below and follow us as we watch the design come to life over the next two years.

Foundation

Foundation of the parking levels below the Comcast office building. (above)

Site View

Standing on top of Parking level 2 looking towards the stadium. (above)

Building View

Standing on top of Plaza level looking towards the stadium. This will have 4’ of dirt on top of it, with landscaping on top. (above)

On Site View

Standing on top Parking level 2 just above the loading dock, looking towards the stadium. (above)

PANO

Standing in the stadium just behind home plate looking towards Comcast office building. (above)

Loading Dock

Looking towards the loading dock area that has 6 grease traps and all the transformers. (above)

Lobby

Standing on Parking level 2 looking into what will be part the multistory Comcast office lobby. (above)

P2_Towards Pond Deck

 

Standing on Parking level 2 looking towards the Pond parking deck. (above)

Plaza_Pano

Standing on top of Plaza level looking towards the stadium. This will have 4’ of dirt on top of it, with landscaping on top. (above)